Debris removal at Fukushima plant resumes

26 September 2024

Japan’s Tokyo Electric Power (TEPCO) has restarted the trial removal of nuclear fuel debris from the Fukushima Daiichi plant.

Fukushima Daiichi nuclear plant in Japan Fukushima Daiichi nuclear plant. (PHOTO: Reuters)

According to a company official, the works had previously been suspended due to an equipment malfunction. 

The preparatory work, which is the first of its kind to be undertaken at the site since a powerful tsunami destroyed the plant in 2011, was suspended last month on August 22, due to an error in the installation of the extraction equipment. 

Works to remove the debris, which consists of around 880 tonnes of nuclear fuel debris and parts of the plant’s infrastructure, have now resumed.

The debris was originally scheduled for removal at the start in 2021, but was delayed due to the COVID-19 pandemic.

In August last year, TEPCO started to release treated radioactive water from the Fukushima plant, as part of the decommissioning process, which resulted in a ban of Japanese seafood imports by China, Japan’s top seafood buyer at the time.

Cost of Fukushima nuclear disaster rises to $ 188 bn Japan’s government seeks improved performance as costs soar on reparation work at the site of Japan’s worst ever nuclear plant disaster
Snake-like robot to be deployed at wrecked Fukushima power plant Japan’s Tepco to survey Fukushima Daiichi with robot and drones for decommissioning

(Reporting by Katya Golubkova; Editing by Stephen Coates)

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Ollie Hodges Publisher Tel: +44 (0)1892 786253 E-mail: [email protected]
Lewis Tyler
Lewis Tyler Editor Tel: 44 (0)1892 786285 E-mail: [email protected]