Moss Abbruch Pilzhochstrasse demolition, Ludwigshafen

22 July 2021

The German contractor Moss Abbruch takes down a bridge in the city of Ludwigshafen in Rhineland-Palatinate in the south west of the country.

The bridge was 540 m (1,771 ft) long and had a solid mass of around 11,000 cubic metres (388,000 cu ft).

To read more about Moss Abbruch and other leading global demolition contractors, check out the d&ri100 listing in the July-August issue of Demolition & Recycling International.

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Ollie Hodges Publisher Tel: +44 (0)1892 786253 E-mail: [email protected]
Lewis Tyler
Lewis Tyler Editor Tel: 44 (0)1892 786285 E-mail: [email protected]